500KV Hot Dip Galvanized Steel Substation Structure Q345
Description:
Our company has 16 years' manufacturing experience as well as advanced equipment, excellent technical staff and mature technology, which will assure the welding quality of steel structures, the galvanization quality and the firmness. Meanwhile, we have a whole set of quality test equipment to determine the physical properties and sizes of all steel structures, ensuring the desirable quality of the whole electrical substation structures.
The surface of all steel substation structures could be treated by anti-rust techniques, such as hot dip galvanization, powder coated, or painted according to your requests. So the products are weather-resistant, corrosion-resistant and could serve as long as 50 years with less maintenance.
Specifications:
Application: Electrical Power Transformer Substation / Switch Yard
Voltage Grade: 10KV, 13.8KV,33KV, 35KV, 66KV, 110KV,132KV, 220KV, 230KV, 330KV, 500KV
Material: Q235B/A36,Yeild Strength≥235MPa
Q345B/A572,Yeild Strength≥345MPa
GR 50, GR 65
Wall thickness: 2~30mm
Export Experiences: Philippines , Malaysia , Pakistan , Russia , UK , Australia , Ghana , Angola , Tanzania Slovakia , New Zealand , Sierra Leone , Bangladesh , Maxico , Nigeria , Republic of the Congo , etc,
Package: Normally wrapped by plastic bags or burlap cloth at the top and bottom, or according to clients requirement.
Welding: Welding complies with AWS D1.1 standard.
CO2 welding or submerged arc auto methods
No fissure, scar, overlap, layer or other defects
Internal and external welding makes the pole more beautiful in shape
If customers need any other requirements of welding, we also can make adjustment ad your request
Advanatges:
Steel Structure Hot Dip Galvanization Inspection
Engineering and Design Management
In the R&D Department, there are many experienced senior research & design staff and rigid development network, which ensure our design proposals meet customer demand, even exceed their expectations.
Terms and Conditions
1. Price Term: EXW, FOB, CFR or CIF.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
Please feel free to contact us!
Contact Us at Any Time